St. Catherine'sPHASE 2 JUNE 2018 The damp wall has now been repaired and repainted completing the internal work. SEPTEMBER 2017 It was noticed that damp was coming through the wall where the boiler house chimney is located. Our local roofing contractor Eric Wilkinson http://www.brandonparish.org.uk/St.Catherine%27s.htm